The inspection team of the European Commission visits the project
17/12/2015
On 28 and 29 October the monitor José Álvarez, representative of the External Team NEEMO-IDOM, made the second visit to the LIFE project Potamo Fauna. During these two days the main aim was to review the administrative documentation and do technical visits to reproduction centers –naiads, native crayfish and turtle breeding center- and verification of a new small ponds created in 2014 in Lower Ter River and in Llémena River to improve the populations of European Pond Turtle and other reptiles and amphibians, which was explained in situ as the monitoring of Emys orbicularis made after the first release this current year.
Saved under: General